Quality Wind

Name: Quality Wind
Location: Tumbler Ridge, B.C., Canada
Fuel source: Wind
Year commissioned: 2012
Owned capacity:  142 MW
% Owned/Operated: 100/100

 

Capital Power’s 142-megawatt (MW), Quality Wind facility located near Tumbler Ridge, British Columbia began commercial operation on November 6, 2012, on time and under budget. The facility is now supplying renewable energy to British Columbia’s power grid.

The project involved the installation of 79 Vestas V90 and V100 wind turbines, which will each produce 1.8 MW of power. The V90 technology is the same turbine equipment that Capital Power is utilizing at its Halkirk Wind Project in Alberta, commissioned in December 2012, and its Port Dover & Nanticoke wind project, commissioned in November 2013.

The Quality Wind Project received a 25-year Electricity Purchase Agreement in March 2010 to supply clean, renewable energy to B.C. Hydro. The project will generate enough clean electricity to meet the average annual needs of about 43,000 homes.

Community Engagement

We are committed to having a presence in each of the communities in which we work: 

Community Blade Signing

On June 22, 2012, Capital Power held a BBQ and community event in Tumbler Ridge to provide local residents with an opportunity to put their mark on history by signing a 49-metre long Vestas wind turbine blade. The blade, hoisted into place on wind turbine #63 (on road M2), is now generating clean power for British Columbians.

Quality Trail Boardwalk

In 2011, Capital Power helped fund improvements to the Quality Trail. Together with volunteer labour, a boardwalk was built for the community.

 

Facility Facts

  • Quality Wind began commercial operation on November 6, 2012, on time and under budget

  • Final costs for the $455-million Quality Wind facility is expected to be approximately 10 per cent below budget

  • Installed capacity is 142 MW from 79 Vestas 1.8 MW turbines

  • Quality Wind is located on approximately 4,250 acres (1,720 ha) of provincial Crown Land near Tumbler Ridge, in north-eastern British Columbia

  • Each turbine tower is 95 metres high (from base to centre of hub)

  • 22 km, 230 KV transmission line, collector lines and substation

  • In March 2010, B.C. Hydro awarded Capital Power a 25-year Electricity Purchase Agreement (EPA) for the Quality Wind Project

  • The facility has the capacity to generate enough power to meet the average annual needs of approximately 43,000 homes  

 

 

 

 

 

Last reviewed: June 2014