|
Name: Miller Creek Location: Near Pemberton, British Columbia, Canada Fuel source: Hydro Type of generating plant: Hydroelectric Year commissioned: 2003 Owned Capacity: 33 MW % Owned/Operated: 100/100
View more photos of Miller Creek |

|
- Run-of-river hydroelectric power facility on Crown Land (leased by Capital Power)
- Consists of a 30-megawatt (MW) main unit and a 3-MW unit for peaking and use during the low-water creek flow season
- Capital Power pays water rental fees to the Province of British Columbia for the use of water
- Power is sold to BC Hydro under contract (through to 2023)
- The Miller Creek facility has an automated control system to allow unattended operation, remote monitoring and remote control of the project, which helps reduce its operating costs
- Water-flows on Miller Creek peak from May through August, with relatively low flows in the winter months
Last Updated: March 12, 2012